Project Profile:

ADAMS STREET STATION at Alltel Stadium

Project Summary

Two seperate Rainstore3 chambers control the stormwater from all the hard surface runoff. One chamber is comprised of 1466 total RS3 units at 0.2 meters high and the other chamber has 636 total units at 0.3 meters high. Two and Three unit high Rainstore3 was used for its shallow cross-section - the site has an extremely high water table.

Address

736 Adams Street

Install Size

1466 RS3 units and 636 units

Designer

Ferguson Jacksonville Waterworks for the Rainstore3 Chamber and Infinity Builder Designs for the Site.

Contractor

Coxwell, JB Contracting Inc.

Project Gallery

Stormwater Detention was installed at the Adams Street Station at Alltel Stadium in Jacksonville, Florida, using Rainstore3.
Excavation continues as some of the RS3 units are being placed and covered (larger of the two chambers).
An Underground-Stormwater-Retention System was installed at the Adams Street Station at Alltel Stadium in Jacksonville, Florida, using Rainstore3.
The larger of the two chambers had RS3 units stacked two high to account for the high water table. The other chamber (not shown) had the RS3 units stacked three high, also to combat the high water table.
Stormwater Storage was installed at the Adams Street Station at Alltel Stadium in Jacksonville, Florida, using Rainstore3.
Worker cover the RS3 with geogrid and fabric (the larger chamber).
Rainwater Storage was installed at the Adams Street Station at Alltel Stadium in Jacksonville, Florida, using Rainstore3.
The larger of the two Rainstore3 chambers gets wrapped in fabric.