Polaris Place, Aliso Viejo, California

Project Name: Polaris Place

Eastern fire lane of Grasspave2 winds between the buildings to the outer ring road. There is even a slight vertical profile evident here.

Eastern fire lane covers the entire grass area. Using Grasspave2 allows you to combine hard surface sidewalks at any angle.

Western section starts at ring road and parking lots, over the sidewalk area to the central courtyard behind the camera.

Product: Grasspave2 pervious fire lane

Application: Fire Lane

City: Aliso Viejo

State/Province: California

Install Date: 2001

Install Size: 370 m2 (4000 sq ft)

Address: 26198 Laguna Hills Drive, Aliso Viejo, CA (aka Aliso Viejo Parkway at Hwy 73 intersection)

Client: Shea Vantis was the original name for this complex. Fluor Daniel’s and Quest Software are the two anchor clients.

Designer: NA

Contractor: NA

Directions: Hwy 73 and intersection with Laguna Hills Drive to the northeast and Aliso Viego Parkway to the southwest, drive northeast to the building on the right.

Location: The main long fire lane behind the first long building from the eastern to the western side of the ring road. Competitor’s products are featured in the SE and SW corners of the southerly buildings.

Photography: Vicki Bohnhoff, November 2004

Summary: It isn’t often that a project includes both our Grasspave2 and a competitor’s concrete version of grass paving. Here you can see that the client takes good care of all four sections, our two, and the competitor’s two.

This entry was posted in California, Grasspave2 and tagged , , , , , . Bookmark the permalink.

Comments are closed.