Harvard Westlake Middle School, Beverly Hills, California

Project Name: Harvard Westlake Middle School

The excavated area is leveled and ready for Rainstore3 installation.

Geogrid is placed.

Geotextile fabric is placed and ready for geogrid

View of the entire chamber.

An access port pipe is placed tall enough for the cover and final landscaping.

Compacting the side fill in lifts around the Rainstore3.

Workers connect the inlet/outlet pipes to the chamber.

Product: Rainstore3  underground detention pond

Application: Underground Stormwater Detention

City: Beverly Hills

State/Province: California

Install Date: May 2008

Install Size: 3,300 units – 11,654 ft3

Address: 700 North Faring Rd., Beverly Hills, CA

Client: Harvard Westlake Middle School

Designer: Jeffery M. Kalban & Associates

Contractor: Blois Construction

Directions: 700 North Faring Rd., Beverly Hills, CA

Location: The Rainstore3 is located in the middle of the campus in a large landscaped area between the two large buildings.

Photography: Blois Construction

Summary: Due to limited working space the Rainstore3 was installed in two steps. Approximately half the area was excavated and then the Rainstore3 units were installed. Once the first section was covered the 2nd half was excavated. The units were placed and covered. Once construction of the school is completed the area over the Rainstore3 will be landscaped.