Project Profile:
Alta High School
Project Summary
There is a sidewalk area where the heavy loading has broken it. This site is too heavily irrigated and needs micronutrients. Mark fire lane access carefully so that normal lawn aeration equipment can be used on the regular lawn areas, but avoided on the Grasspave2 for obvious reasons. It will break the plastic structure.
Address
11000 South and 1000 East, Sandy, UT
Install Size
650 m2 (7,000 sq ft)
Designer
N.A.
Contractor
Nelson Trucking was GC who involved Intermountain Piping (ISI Distributor); Alpine Landscaping did the installation
Project Gallery
View just inside the gate with Grasspave2 8’ to the right of the sidewalk, jogging to the right and continuing all the way toward the running track beyond the school building.
Camera is in the center of this fire lane, which continues along the sidewalk. Students regularly walk on the grass.
This 26’ area to the right of the sidewalk is not only reinforced for vehicle access, but also is used for football practice. The tackle apparatus has been moved to show that grass will turn yellow when deprived of sunlight, and then turn green quickly.
Looking toward the track, the wide area of Grasspave2 in the foreground is indiscernible from practice lawn areas beyond.