Project Profile:

Ardmore Softball Complex

Project Summary

The emergency access has been used and the park maintenance workers said it has held up well. Editor’s note: Grass grown over sandy gravel, as we require for vehicle loading, is grass grown over a highly porous, nutrient voided base. NPK fertilizers with micronutrients (now readily available) are necessary because grass needs a wide range of valuable supplements (trace elements), not just nitrogen, phosphorous, and potassium.

Address

2704 Softball Complex Road

Install Size

420 m2 (4520 sq ft)

Designer

N.A.

Contractor

Kornhaas Construction, 580-226-2719

Project Gallery

Porous-Grass Pavers were installed in the emergency-access lane to the Softball Complex using Grasspave2.
Emergency access entrance with pavement marking.
Pervious Pavers were installed in the emergency-access lane to the Softball Complex using Grasspave2.
Inside gate, the reinforced grass area is used for vehicle access.
Permeable Pavers were installed in the emergency-access lane to Softball Complex using Grasspave2.
Make sure that the overhead brace for the fencing will clear the ambulance.