303-233-8383 [email protected]

Project Profile:

Boone Pickens Stadium – OSU

Project Summary

The oldest football specific stadium west of the Mississippi, needed a state-of-the-art drainage layer under the real grass to replace the artificial turf. OSU chose Draincore2.

Address

700 W Hall of Fame Ave, Stillwater, OK 74075

Install Size

approx. 8300 m2 (90,000 sq ft)

Designer

Oklahoma Athletic Dept

Contractor

AirField Systems, Oklahoma City, OK, 405-359-3775

Project Gallery

Boone Pickens Stadium Drainage
Rolls of Draincore2 are placed on the geomembrane liner.
Boone Pickens Stadium Drainage
Draincore2 rolls are installed quickly after the field is leveled and geomembrane is placed.
Draincore2 in the Football field
Rolls of Draincore2 fit nicely next to the adjacent rolls, making a uniform, efficient, drainage layer.
A rendering of a typical cross-section, similar to Boone Pickens Field, with Draincore2.
A rendering of a typical cross-section, similar to Boone Pickens Field, with Draincore2.