303-233-8383 [email protected]

Project Profile:

Christ Chapel

Project Summary

70,000 sq ft of Draincore2 and 70,000 sq ft of Grasspave2 makesthe Christ Chapel parking lot a model of drainage efficiency. Draincore2 sits atop an impermeable liner and conveys water, at a slope, to pipe at the lowest portion of the system. Pipe carries water to a sump pump. A geotextile filter fabric separatesDraincore2 from 12 inches of base course. Grasspave2 was placed on top of thebase course for 70,000 sq ft of grass parking. The parking lot is only open when services are in session. All other time bollards prevent the Grasspave2 parking lot from being used. Daily visitors park in a impermeable concrete lot.

Address

3701 Birchman Ave, Fort Worth

Install Size

6500 sq meters (70,000 sq ft) Draincore2 and 6500 sq meters (70,000 sq ft) Grasspave2

Designer

Scott Martsolf, Architect

Contractor

Roger Henjum, Concrete Paver Systems, 1215 Crest Lane Dr, Duncanville, Texas  75137

Project Gallery

Grasspave2 Parking lot
Concrete curbing surrounding the Grasspave2 parking lot.
Grasspave2 parking
The 70,000 sq ft of Grasspave2 is placed and ready for sand.
Grasspave2 grass paver parking lot
Rolls of Grasspave2 are placed and fastened together.
Draincore2 to pipe
The Draincore2 portion is connected, via pipe, to the sump.
Draincore2 sub drainage
The surface is ready for Grasspave2. The liner is just visible coming up from under the Draincoe2.
Draincore2 and Grasspave2 parking lot
The area is graded and ready for construction.
Grasspave2 and Draincore2 parking lot
The parking lot is graded and ready for base course.