303-233-8383 [email protected]

Project Profile:

Civic Youth Center, City of Key Biscayne

Project Summary

Grasspave2 at the back to support trucks at the loading dock.

Address

530 Crandon Boulevard

Install Size

30 m2 (324 sq ft)

Designer

City of Key Biscayne with Gap Architectural Products

Contractor

Jame Cummings, General Contractor

Project Gallery

A Grass-Reinforced-Utility Lane was installed at the Civic Youth Center, City of Key Biscayne, Key Biscayne, Florida, using Grasspave2.
Grasspave2 makes a great utlity drive for infrequent access to the door.
Grass Pavers were installed at the Civic Youth Center in the City of Key Biscayne, Key Biscayne, Florida, using Grasspave2.
The loading dock is used about once a week.