Project Profile:
Civic Youth Center, City of Key Biscayne
Project Summary
Grasspave2 at the back to support trucks at the loading dock.
Address
530 Crandon Boulevard
Install Size
30 m2 (324 sq ft)
Designer
City of Key Biscayne with Gap Architectural Products
Contractor
Jame Cummings, General Contractor
Project Gallery
Grasspave2 makes a great utlity drive for infrequent access to the door.
The loading dock is used about once a week.