Project Summary

There is no cut curb to delineate the Grasspave2 drive which leads to a low rise concrete platform where a small section of Gravelpave2 was installed.

Address

67th Avenue NW and 25th St, Miami International Airport, Miami, FL  33147

Install Size

475 m2 (5113 sq ft)

Designer

N.A.

Contractor

N.A.

Project Gallery

Permeable Pavers were installed in access areas at Delta Airlines Cargo Building 702, Miami, Florida, using Grasspave2.
Grasspave2 lane starts at the curb joint in the foreground and proceeds to the left.
Pervious Paving was installed in access areas at Delta Airlines Cargo Building using Grasspave2.