Project Profile:
East-West Center
Project Summary
This area will be used as overflow parking when events are held.
Address
1601 East-West Road
Install Size
950 m2 (11,000 sq ft)
Designer
Umemoto Cassandro Design Corp.
Contractor
Green Thumb Inc.
Project Gallery

In the background, rolls of Grasspave2 sit atop installed sections of the system. Sand is placed inside of Grasspave2 rings. In the foreground, the proper base has been compacted and is ready for Hydrogrow.

The completed system makes a beautiful overflow parking lot.