Project Summary

Facebook's data needs have grown rapidly enough they needed their own data center. The new center has a host of ecologically friendly features, such as evaporative cooling, airside economizer, server heat reuse, state-of-the art UPS, and Gravelpave2 porous pavement. Gravelpave2 was used as the access and service road for heavy trucks, deliveries, and more. Gravelpave2 provides the site with the pavingstrength it needs and porosity for stormwater management.

Address

500 SW Connect Way, Prineville, Oregon

Install Size

16,900 m2 (181,890 sq ft) 

Designer

N.A.

Contractor

Taylor NW

Project Gallery

Gravelpave2 access road
This installation photo of Gravelpave2, shows the system ready to be filled with the decorative gravel. Facebook chose gray colored Gravelpave2 to match the fill.
This installation photo of Gravelpave2, shows the system ready to be filled with the decorative gravel. Facebook chose gray colored Gravelpave2 to match the fill.
The finished Gravelpave2 road matches the environmental policy of the Facebook facility.
Gravelpave2 porous gravel road.
The Gravelpave2 porous gravel road, nearly complete.
Gravelpave2 permeable gravel road at Facebook
Gabion baskets sit adjacent to the Gravelpave2 permeable road.
Gravelpave2 being filled with gravel.
Gravelpave2 being filled with gravel.