Project Profile:

Goodyear Community Park

Project Summary

Goodyear Community Park wanted to incorporate a fire lane without interrupting the landscaping. Gravel and grass areas were already designed into the area and Grasspave2 and Gravelpave2 were a natural solution.

Address

3151 N. Litchfield Rd.

Install Size

1400 m2 (15,000 sq ft both GP2 and GV2)

Designer

City of Goodyear

Contractor

N.A.

Project Gallery

Aggregate and Grass Paving were both installed in the fire lane access areas at Goodyear Community Park, Goodyear, Arizona, using Gravelpave2 and Grasspave2.
The drop down bollards indicate where the Gravelpave2 fire lane starts. Visible is a slight difference between the supported fire lane and unsupported gravel area.
Gravel and Grass Reinforcement were installed in the fire lane access areas at Goodyear Community Park, Goodyear, Arizona, using Gravelpave2 and Grasspave2.
The left side of the photo shows difference in the Gravelpave2 fire lane and the unsupported gravel.
Gravel and Grass Paving were installed in the fire lane access areas at Goodyear Community Park, Goodyear, Arizona, using Gravelpave2 and Grasspave2.
An expansive shot of the gravel area. The Gravelpave2 fire lane cuts from the left of the photo to the right (Grasspave2) area.
Gravelpave2 and Grasspave2 were installed in the fire lane access areas at Goodyear Community Park, Goodyear, Arizona.
A concrete curbing separates the Gravelpave2 from the Grasspave2 area. The Grasspave2 fire lane continues into the background of the photo and toward the concession stand building.
Grass and Gravel Permeable Paving were installed at Goodyear Community Park, using Grasspave2 and Gravelpave2.
A shot of the Goodyear park sign with an area of Grasspave2 fire lane to the left.
Grass and Gravel Grid Paving were installed at Goodyear Community Park, using Grasspave2 and Gravelpave2.
A closer view of the gravel. A Slight difference can be seen in the Gravelpave2 area (left and center) and the unsupported gravel (right).