Project Profile:
Grand Valley State University
Project Summary
Bill Roh, Site Manager for Pioneer Construction said “I could have hired twelve year olds to put these legos in place. It was that easy.” The site is 25’ x 95’ approximately on the site plan. Vortechs’ phone is 207-878-3662. Vortechs is the cleaning system for stormwater. This RS3 was shipped a year ago and was just put in this month. The contractor stored it for a year for the client. Bill said that they were going to put six inches of concrete on top of the RS3. At the time I took pictures, there was only dirt, and even a skid parked on top.
Address
NE Corner Of Michigan & Layayette, Grand Rapids, MI 49501
Install Size
204 m2
Designer
Civil Engineering firm is Prein & Newhof, Jim Kirtwood
Contractor
RS3 installer – Dykema Excavating, Bill Hoogerhyde, 616-363-6895. Pioneer Construction is building the structure.
Project Gallery

View of Health Professions Education Building for Grand Valley State University, while under construction. Rainstore3 is located in the parking lot between the triangle wood barrier on the right and one on the left.

Inlet at the far end of the rectangular installation.

A skid was parked on top of the Rainstore3 installation to protect it from traffic during construction. The wearing course will be a 6” depth of concrete.

Close-up of the Vortechs system for filtering stormwater that will be deposited into the Rainstore3 system. This and other systems are compatible with Rainstore3. Please see design details on our web.