Project Profile:
Joe Brown Chevrolet
Project Summary
This system used a flow-thru design and the orifice restriction at the adjacent manhole provided the release control. Stormwater detention for close to 3 acres of impervious area.
Address
2455 East Market Street, Harrisonburg, VA
Install Size
15,000 cu ft (3568 units)
Designer
Ed Blackwell of Blackwell Engineering
Contractor
Partners Excavating of Harrisonburg
Project Gallery

Preparing the surface below the Rainstore3 chamber. In this case, 3 inches of rock.

in the background, Rainstore3 cells stacked, prior to final positioning. In the foreground, fabric is being positioned.

The cells are positioned and ready for covering with geogrid and fabric.

Asphalt covering the Rainstore3 chamber with the storm inlet visible.

Trucks parked in the display lot over the detention system.

A sign for the new construction a Joe Bowman Chevrolet.