303-233-8383 [email protected]

Project Profile:

Lake Park Golf Course & Bangerter Hwy

Project Summary

Flags of the building across the street will be a good marker when viewing the photos at left. There must be a good fertilization program, because this is a five-year-old installation and the grass is very healthy. Other utilities, such as a storm drain and sewer access cover, are in the utility lane at ground level. None of the photos clearly show them in the grass, but you can find them when you walk the site.

Address

2400 South and Bangerter Highway, West Valley City, UT

Install Size

1,200 m2 (13,000 sq ft)

Designer

Gene Bates, Salt Lake City, UT

Contractor

Zion Securities, Salt Lake City, UT

Project Gallery

Grass Paver was installed in the utility-access areas using Grasspave2.
View of utility pad at the corner of Bangerter Hwy and 2400 South. The grass in the background is reinforced with Grasspave2.
Turf Reinforcement was installed in the utility-access areas using Grasspave2.
Entrance to the utility access is between the vertical controls on the left and the trees on the right.
Pervious Grass was installed in the utility-access areas using Grasspave2.
The utility access is very long with the controls and manholes shown in Photo #1 behind the camera and the golf course in the far distance.