Another dormitory is under construction, July 2001, to the south side of Dormitory C, so some of the Grasspave2 has been torn up on the south side of the sidewalk. Repairs will be made when the building is finished.

Address

Linfield College, Linfield Avenue, McMinnville, OR

Install Size

N.A.

Designer

N.A.

Contractor

Teufel Landscaping

Project Gallery

Permeable Pavers were installed in the fire lane access area at Linfield College, McMinnville, Oregon, using Grasspave2.
Start of the fire lane on Lever Street is shown with red painted curb behind Dormitory C, with D also visible.
Grass Paving was installed in the fire lane access area at Linfield College, McMinnville, Oregon, using Grasspave2.
Close-up of reinforced grass near Dormitory D.
Pervious Paving was installed in the fire lane access area at Linfield College, McMinnville, Oregon, using Grasspave2.
Note the red painted curb where fire trucks enter from the parking lot.
Turf Reinforcement Mats were installed in the fire lane access area at Linfield College, McMinnville, Oregon, using Grasspave2.
The grass is doing very well here. The mulched bed with shrubbery marks the edge of the Grasspave2.