Project Profile:
MCI Administration Complex
Project Summary
The Grasspave2 fire lane provides a nice border of green next to the building and with the numerous trees on the site, the visual impression is a work place in the woods.
Address
7000 Weston Parkway, Cary, NC 27513
Install Size
750 m2 (8,073 sq ft)
Designer
N.A.
Contractor
Fred Adams Paving, 5813 Triangle Drive, Raleigh, NC 27613
Project Gallery

The GP2 fire lane is located in the center of this photo where you can see a mountable curb for the section where the trucks would drive.

Stay on the high ridge and follow the GP2 fire lane back toward the fire hydrant on the corner, then the lane bends to the right along the face of the building.

Hydrant is shown on the left. This is the section of GP2 along the face of the building going back toward the overhead pedestrian bridge from the parking lot at the top of the hill.

View looking backward toward the wooded street. You can see the multiport hydrant in the foreground and there is a fire lane sign back on the left.

1991 photo of MCI showing the end of the fire lane where it comes close to the overhead pedestrian bridge.