303-233-8383 [email protected]

Project Profile:

McKinley Children’s Center

Project Summary

Grasspave2 was used to add a more pleasant environment.

Address

762 W. Cypress Avenue, San Dimas, CA  91773

Install Size

340 m2 (3,660 sq ft)

Designer

N.A.

Contractor

McCormick Construction Company, 2507 Empire Avenue, Burbank, CA  91504

Project Gallery

McKinley Children's Center main entrance - the Grasspave2 area is just a half block back of this entrance, at the far end of the employee parking lot on the right of the main road.
Turn right into this parking lot and the Grasspave2 is at the back of this lot where you see the grass in front of the building. See a close up of the area in the next photo.
This is a close up from the previous photo showing the markings on the asphalt that this is a fire lane and to keep clear. The AD Building is shown in a pink color on the right.
This is a backwards view from the previous photo with the Grasspave2 in the foreground looking into the parking lot toward the entrance drive near the center tree.