Project Profile:

Methodist Le Bonheur Germantown Hospital & Fire Department Test

Project Summary

The Germantown Fire Department required onsite testing for the Hospital fire lane installation. Invisible Structures recommends testing with grass grown on the system (with two weeks of rooting), however even without grass, this installation passed with flying colors. Even with the fully extended ladder, the outriggers are no match for the impressive 15,940 psi compressive strength of Grasspave2.

Address

7691 Poplar Ave, Germantown, TN 38138

Install Size

1800 sq meters (19,400 sq ft) 

Designer

N.A. 

Contractor

Pro Green Landscapes

Project Gallery

The ladder is extended with the outriggers engaged.
The ladder is extended with the outriggers engaged.
The Grasspave2 grass fire lane extends around the hospital.
The Grasspave2 grass fire lane extends around the hospital.
Germantown Fire Department tests the Grasspave2 filled with sand.
Germantown Fire Department tests the Grasspave2 filled with sand.
Even with the outriggers down, the Grasspave2 holds up to the enormous pressure.
Even with the outriggers down, the Grasspave2 holds up to the enormous pressure.