Project Profile:
Methodist Le Bonheur Germantown Hospital & Fire Department Test
Project Summary
The Germantown Fire Department required onsite testing for the Hospital fire lane installation. Invisible Structures recommends testing with grass grown on the system (with two weeks of rooting), however even without grass, this installation passed with flying colors. Even with the fully extended ladder, the outriggers are no match for the impressive 15,940 psi compressive strength of Grasspave2.
Address
7691 Poplar Ave, Germantown, TN 38138
Install Size
1800 sq meters (19,400 sq ft)
Designer
N.A.
Contractor
Pro Green Landscapes
Project Gallery

The ladder is extended with the outriggers engaged.

The Grasspave2 grass fire lane extends around the hospital.

Germantown Fire Department tests the Grasspave2 filled with sand.

Even with the outriggers down, the Grasspave2 holds up to the enormous pressure.