Project Profile:

Pilling Pond Boat Ramp

Project Summary

The project is part of a lake and pond demonstration grant from the Massachusetts Department of Conservation and Recreation to improve water quality through demonstration BMPs.

Address

East of the intersection of Walnut St and Summer Street, Lynnfield, MA

Install Size

Approx. 100 m2 (1200 sq ft)

Designer

Steven P. Roy, GeoSyntec Consultants, Inc.

Contractor

N.A.

Project Gallery

Aggregrate Paver was installed in the access area of the Pilling Pond Boat Ramp, Lynnfield, Massachusetts, using Gravelpave2.
Gravelpave2 provides stabilization an porosity for this boat ramp.
Porous Pavers were installed at the Pilling Pond Boat Ramp, Lynnfield, Massachusetts, using Gravelpave2.
Supported gravel in Gravelpve2 (right) adjoins unsupported aggregate (left).
Permeable Paving was installed at the Pilling Pond Boat Ramp, Lynnfield, Massachusetts, using Gravelpave2.
Exposed Gravelpave2 rings are easily remedied by brushing migrated gravel back over exposed areas.