303-233-8383 [email protected]

Project Profile:

Presbyterian Church

Project Summary

The contractor said it was very easy to install and use.- very straight forward. The sharp clean sand was readily available from TMT out of San Jose, Ca. The Grasspave2 cells were filled with the sand and the excess was just brushed off. The sod was purchased through Delta Bluegrass.

Address

3450 Cornerstone Ct

Install Size

2122 m2 (22,839 sq ft)

Designer

Ruggeri - Jensen - Azar

Contractor

Mainglia Landscape

Project Gallery

Overflow parking for the church is disguised as green space.
The asphalt is flush with the Grasspave2 surfacing for a smooth transition for drivers.
Cutouts for trees are easily accomplished in Grasspave2. Trees and large vegetation thrives in Grasspave2 and other porous pavements.
Low use parking applications are ideal for Grasspave2.
The secondary curbing limits automobiles from accidentally driving on a non-Grasspave2 turf surface.
More overflow parking with Grasspave2 in this secondary area.