Project Summary
This area will not be subject to vehicular traffic. Rainstore3 was used in this site for its high efficiency. The tight constraints made Rainstore3 the only viable option.
Address
5745 Pacific Center Blvd, San Diego, CA
Install Size
4320 units (16,000 cu ft storage)
Designer
RBF Consulting
Contractor
Roel Construction
Project Gallery

Entrance sign to Qualcomm’s facility.

The excavated area before installation.

Geogrid and geotextile will be placed next.

Geotextile and a good percentage of the Rainstore3 units have been installed.

A shot of some of the remaining Rainstore3 Cell stacks, that will be placed.

Rainstore3 is installed grid side down and cylindar side up.