Project Profile:
Quality Inn at Kill Devil Hills
Project Summary
The drive entrance looks good and it survived the Isabel Hurricane really well.
Address
2009 South Virginia Dare Trail, Kill Devil Hills, NC 27948
Install Size
745 m2 (8,020 sq ft)
Designer
N.A.
Contractor
McEwen Construction Co. Inc.
Project Gallery

View of the front of the Quality Inn on the beach side of the road. The GV2 parking lot is across the street from this sign.

Entrance to the parking lot has a little bit of sand because of the hurricane. Other areas along this street had what looked like snow banks of sand. The rings are staying in place nicely.

A little bit of maintenance with a push broom could move the stone fill into the areas where the rings are showing at the surface.

Back of the lot looks good with only a strip on the far left needing some gravel fill in the rings. Evidently the contractor did a good job of pinning the GV2 mats in place because they survived the hurricane that removed some houses and did severe damage to many others.