Project Profile:
RPAC Ohio State University
Project Summary
Formerly Larkins Hall, the Recreation and Physical Activity Center (RPAC) needed an attractive way to supply a fire lane to the facility. To match the beauty of much of the Ohio State University Campus, Designers chose Grasspave2 porous pavement for the fire lane.
Address
337 W. 17th Avenue Columbus, OH 43210
Install Size
880 m2 (9500 sq ft)
Designer
Project Management Consultants
Contractor
Zuber Landscape, Gilbane (General Contractors)
Project Gallery

Aerial shot of the RPAC building.

Grasspave2 pervious paving used in the fire lane of the RPAC facility. This is the west building of the RPAC.

The East building of RPAC with a Grasspave2 porous paving grass firelane.

A closer look at the grass in the Grasspave2 fire lane.

Another view of the RPAC facility, built in 2004 to replace Larkins Hall Gynmasium.