Project Profile:
Ruby Tuesday
Project Summary
There is parking for about eight cars. Unfortunately, there is too much gravel on top the rings. It’s working okay, just not ideal. Gravelpave2 should have gravel filled to a maximum of 1/4” above the top of the rings, after compaction.
Address
346 Robert Small Parkway, Beaufort, SC 29902
Install Size
150 m2 (1,615 sq ft)
Designer
N.A.
Contractor
N.A.
Project Gallery

View of front of Ruby Tuesday Restaurant. GV2 parking is in a strip at the back of the lot.

It’s a good idea to edge the GV2 parking areas with raised curbs so that vegetation will stay out of the driving area.

The asphalt aisle is graded toward the GV2 for stormwater flow and percolation into subsoils.

This strip of parking is divided by an entrance way.

Two parking spots of GV2 are on this side of the entrance. There really is no need to stripe the GV2 since people tend to park reasonably well without striping.