Project Summary

Gray Gravelpave2 was used for reinforcing the 2’ wide gravel bed around the perimeter of the post office building. Rainwater and snow slide directly down the metal roof onto the gravel. There are no drainage gutters.

Address

Seneca, PA Post Office, 219 Main St., Seneca, PA  16346

Install Size

60 m2 (646 sq ft)

Designer

N.A.

Contractor

Delta Contractors

Project Gallery

Permeable paver was installed around the Post Office in Seneca, Pennsylvania, using Gravelpave2.
Front of the post office shows the two foot wide gravel reinforced beds on both sides of the entrance door.
Porous pavement was installed around the Post Office in Seneca, Pennsylvania, using Gravelpave2.
Gravel beds surround the building, underneath the eaves to catch snow dropping or rain dripping off the sloped roof.
Gravel reinforcement was installed around the Post Office in Seneca, Pennsylvania, using Gravelpave2.
Two foot wide gravel bed extends the length of the building on both sides to catch roof runoff from rain or snow. There are no gutters attached to the building roof line.
Aggregate paver was installed around the Post Office in Seneca, Pennsylvania, using Gravelpave2.
Close up look at the size of gravel used. Near the vegetation a couple of 2” gray rings of Gravelpave2 are visible. This is the secret to keeping the gravel in place when rain or snow fall drop onto the reinforced area.