303-233-8383 [email protected]

Project Profile:

Shoreline Christian School

Project Summary

Shoreline Christian Center, Directions – It was installed about a month before we visited, May 2003, and the new seeded GP2 site had freshly germinated grass, not yet mown. The site is between the school and the new gymnasium which is located nearest the entrance to the complex. 1,800 to 2,000 sf.

Address

N.A.

Install Size

1800 to 2000 sq ft

Designer

N.A.

Contractor

N.A.

Project Gallery

Turf-Reinforcement Mats were installed in the fire lane access areas at Shoreline Christian School in Austin, Texas, using Grasspave2.
Seeded within the past three weeks, the grass is already high enough to mow.
Porous Paving was installed in the fire lane access areas at Shoreline Christian School in Austin, Texas, using Grasspave2.
Close up of back section with utility access behind the wooden gates.
Pervious Pavers were installed in the fire lane access areas at Shoreline Christian School in Austin, Texas, using Grasspave2.
Overall view of fire lane from the street. Note that the covered walkway is high and wide enough to accommodate any size trucks.