303-233-8383 [email protected]

Project Profile:

Sunrise Assisted Living

Project Summary

The Grasspave2 product was used for a fire lane over the grass on the west front of the building entering from the street. Vertical blue reflectors indicate the fire lane.

Address

129 East Lake Street, Bloomingdale, IL 60108

Install Size

190 m2 (2,045 sq ft)

Designer

N.A.

Contractor

Paul H. Schwendener, Inc., 1000 Vandustrial Dr, Westmont, IL 60559, contact Tom Jones at 630-971-3303

Project Gallery

Permeable-Grass Pavers were installed at Sunrise Assisted Living, Bloomingdale, Illinois, using Grasspave2.
Front circular drive entrance. Fire lane is at the far end of the property, past the red hydrant to the largest tree in the center of the photo and the brick facing on the building. See Photo #3.
Porous Pavement was installed at Sunrise Assisted Living, Bloomingdale, Illinois, using Grasspave2.
Fire lane entrance off Lake Street between the rows of shrubs and coming toward the camera to the left of the white bench.
Grass Paving was installed at Sunrise Assisted Living, Bloomingdale, Illinois, using Grasspave2.
The main grass area shown is the Grasspave2 reinforced area. The red hydrant marks the right side of the fire lane which continues along the face of the building.
Grass-Porous Pavers were installed at Sunrise Assisted Living, Bloomingdale, Illinois, using Grasspave2.
The largest tree is on the left of the fire lane grass area. Vertical aluminum poles with blue reflectors are visible to mark the edges.
Pervious Pavers were installed Sunrise Assisted Living, Bloomingdale, Illinois, using Grasspave2.
The fire truck access area ends at the sidewalk. This is a better visual of the blue reflector poles.