Project Profile:

Target Greatland, Yorktown Center

Project Summary

A unique installation because it ran parallel to the loading dock driveway and then the driveway continued to the front of the customer parking lot but didn’t connect. At the end of the asphalt was the electrical transformer or the telecommunications box, plus some other utility manholes. GP2 driving land started at the end of the retaining wall and went up hill toward the street where the delivery trucks enter.

Address

60 Yorktown Center, Lombard, IL  60148

Install Size

715 m2 (7,696 sq ft)

Designer

N.A.

Contractor

N.A.

Project Gallery

Porous turf reinforcement was installed in the fire lane access areas at the Target Greatland store in Lombard, Illinois, using Grasspave2.
Target Greatland sign at Yorktown Center.
Grass porous pavement was installed in the fire lane access areas at the Target Greatland store in Lombard, Illinois, using Grasspave2.
View of fire lane on top of the retaining wall area near the loading dock access road. Target store can be seen in the background.