303-233-8383 [email protected]

Project Profile:

University Car Wash and Lube Center

Project Summary

Aluminum edging was used to create curving planter beds and a vertical earth mound along the front sidewalk. The high activity areas were all asphalt paving. Stormwater generated from all the hard surfacing can drain over to the grass fire lane.

Address

4665 Bryant Irvin Road

Install Size

325 m2 (3,500 sq ft)

Designer

N.A.

Contractor

Innovative Developers, Inc., 777 Main Street, Suite 200, Fort Worth, TX 76102

Project Gallery

Turf pavers were installed in the fire lane access areas using Grasspave2.
Overall view of fire lane on left, planter beds, earth mound with trees, sidewalk, and Bryant Irvin Road on right.
Pervious Pavers were installed in the fire lane access areas using Grasspave2.
Grasspave2 fire lane gives a softer look to this busy car wash.
Grass Pavers were installed in the fire lane access areas using Grasspave2.
Grass is a little dry on the right, and probably could use some fertilizer to toughen the blades to resist hot weather.
Porous Pavement was installed in the fire lane access areas using Grasspave2.
Posts and chain are fairly typical across entrances to grass fire lanes.