Project Profile:
Vail Lutheran Church
Project Summary
The main aisle is asphalt with Gravelpave2 parking bays on both sides. Stormwater runoff was the main reason for selecting the Gravelpave2 system. High permeability eliminates stormwater from running down onto the main lower road.
Address
33520 Highway 6, Edwards, CO 81632
Install Size
1150 m2 (12,378 sq ft)
Designer
N.A.
Contractor
Beck and Associates, PO Box 4030, Vail, CO 81658
Project Gallery
Photo used for the Gravelpave2 brochure showing the gravel parking near the main entrance.
Installation of the gravel fill on the southern parking bays. The northern section is completely finished in the background. Rakes were used to do the hand finishing, but a Bobcat can spread the gravel fairly evenly by dragging the bucket.
Flush concrete curbing is used between the asphalt and Gravelpave2.