303-233-8383 [email protected]

Project Profile:

Victoria Square

Project Summary

The street was closed off to create a pedestrian plaza with fountain. Grasspave2 provides a vehicle access across the grass for emergency vehicles. It also assists with wear from pedestrian foot traffic.

Address

C Street and 13th

Install Size

190 m2 (2045 sq ft)

Designer

N.A.

Contractor

Q and D Construction, 1050 S. 21st, Sparks, NV 89431

Project Gallery

Pervious Pavement was installed in the fire lane access and pedestrian areas using Grasspave2.
The street was closed off and a plaza created in front of the Century. Grasspave2 is used to disguise the driving lane.
Turf Pavers were installed in the fire lane access and pedestrian areas using Grasspave2.
View of the easterly driving area where Grasspave2 doubles as a lawn.
Permeable Pavers were installed in the fire lane access and pedestrian areas using Grasspave2.
Grasspave2 combines nicely with fountain features that provide a park setting in an urban area.
Porous Paving was installed in the fire lane access and pedestrian areas using Grasspave2.
People enjoying the grass for the annual Rib Cook Off weekend celebration.