Project Profile:
Duke University Medical Center Parking Garage
Project Summary
There were no cut curb markings or paint to delineate this, but there is no parking on this main street and fire trucks can mount curbs.
Address
North Pavilion, Fulton Street, Durham, NC
Install Size
210 m2 (2,260 sq ft)
Designer
N.A.
Contractor
Red Mill Landscaping, 4517 Red Mill Road, Durham, NC 27706
Project Gallery

Signage on Fulton Street is beyond the fire lane, so go back toward Hwy 147 on the right.

This hydrant marks the entrance to the GP2 fire lane which is located on the far side of it, then follows the curved row of trees.

Looking back toward the street from the parking garage, the GP2 lane takes up most of this picture with the trees on the left edge and the hydrant marking the right side.