303-233-8383 [email protected]

Project Profile:

Murphy Creek Recreation Center

Project Summary

A combination fire lane and utility access from either the street or through the removable bollards from the parking lot.

Address

28301 E Florida

Install Size

180 m2 (1937 sq ft)

Designer

N.A.

Contractor

American Civil Constructors

Project Gallery

Grass Paving was installed in the utility-access areas at Murphy Creek Recreation Center, Aurora, Colorado, using Grasspave2.
A grass utility access adds an attractiveness to the site.
Turf Reinforcement was installed in the fire lane-access areas at Murphy Creek Recreation Center, Aurora, Colorado, using Grasspave2.
Fire lane is at the left in the background of this photo. The yellow fire hydrant can be seen here.