Boone Pickens Stadium Drainage

Boone Pickens Stadium – OSU, Stillwater, OK

Project Name: Boone Pickens Stadium – OSU

Products: Draincore2

Applications:  Sports field Drainage Layer

City: Stillwater

State/Province: Oklahoma

Client: Oklahoma State University

Install Date:  June 2005

Install Size:  approx. 8300 m2 (90,000 sq ft)

Address: 700 W Hall of Fame Ave, Stillwater, OK 74075

Designer: Oklahoma Athletic Dept

Contractor: NA

Directions: 700 W Hall of Fame Ave, Stillwater, OK 74075

Location:  The football field inside the stadium

Photography:  NA

Summary: The oldest football specific stadium west of the Mississippi, needed a state-of-the-art drainage layer under the real grass to replace the artificial turf.  OSU chose Draincore2. 

Boone Pickens Stadium Drainage
Rolls of Draincore2 are placed on the geomembrane liner.
Boone Pickens Stadium Drainage
Draincore2 rolls are installed quickly after the field is leveled and geomembrane is placed.
Draincore2 in the Football field
Rolls of Draincore2 fit nicely next to the adjacent rolls, making a uniform, efficient, drainage layer.
A rendering of a typical cross-section, similar to Boone Pickens Field, with Draincore2.
A rendering of a typical cross-section, similar to Boone Pickens Field, with Draincore2.