Project Profile:
ADAMS STREET STATION at Alltel Stadium
Project Summary
Two seperate Rainstore3 chambers control the stormwater from all the hard surface runoff. One chamber is comprised of 1466 total RS3 units at 0.2 meters high and the other chamber has 636 total units at 0.3 meters high. Two and Three unit high Rainstore3 was used for its shallow cross-section - the site has an extremely high water table.
Address
736 Adams Street
Install Size
1466 RS3 units and 636 units
Designer
Ferguson Jacksonville Waterworks for the Rainstore3 Chamber and Infinity Builder Designs for the Site.
Contractor
Coxwell, JB Contracting Inc.
Project Gallery

Excavation continues as some of the RS3 units are being placed and covered (larger of the two chambers).

The larger of the two chambers had RS3 units stacked two high to account for the high water table. The other chamber (not shown) had the RS3 units stacked three high, also to combat the high water table.

Worker cover the RS3 with geogrid and fabric (the larger chamber).

The larger of the two Rainstore3 chambers gets wrapped in fabric.