303-233-8383 [email protected]

Project Profile:

Edison Community College

Project Summary

David Bishop, Supervisor of Plant Operations, said that Sprint technicians access this equipment on a daily basis. They park their truck straight back onto the grass.

Address

4025 Edison Avenue, Fort Myers, FL  33916

Install Size

60 m2 (646 sq ft)

Designer

N.A.

Contractor

Mastec, Inc.

Project Gallery

Porous Paving was installed at Edison Community College in utility access areas using Grasspave2.
Edison Community College entrance near the Grasspave2 site, and near Parking Lot A.
Pervious Pavers were installed at Edison Community College in utility access areas using Grasspave2.
Flush concrete curbing is used along the entire street, so look for the box off to the right.
Permeable Pavers were installed at Edison Community College in utility access areas using Grasspave2.
Access lane is between the light pole on the left and the palm on the right, going straight back to the telephone box.
Turf Pavers were installed at Edison Community College in utility access areas using Grasspave2.
Side view shows a young hedge boarder that was installed only a year ago. Eventually it will nicely conceal the utility box.
Grass Pavement was installed at Edison Community College in utility access areas using Grasspave2.
View from equipment pad looking toward the Kenneth P. Walker Health Sciences Hall.
Grass Pavement was installed at Edison Community College in utility access areas using Grasspave2.
Shrubs are flanking the grass entrance. Grasspave2 is invisible since surrounding turf shows no demarcation.