Project Profile:

Roberts Academy

Project Summary

Allison Landscaping was charged with finding an aestheticallypleasing solution to providing the maintenance crew access to the detention pond. The Allison team looked both at Grasspave² and Terratame²for a beautiful, grass-covered solution. Both products would work for this site, but since the maintenance vehicles will be no larger than pickup trucks, the Allison team decided Terratame² would work. The ten rolls of Terratame² took less than two days to prep, unroll, and anchor. Grass will grow up and hide the Terratame² by spring.

Address

1702 Grand Ave, Cincinnati, OH 45214

Install Size

400 sq meters (4,300 sq ft)

Designer

Allison Landscaping

Contractor

Allison Landscaping

Project Gallery

Terratame2 acces road
Terratame2 provides a disguised access road to the detention pond.
The Terratame2 road will support the light traffic down to the detention pond.
The Terratame2 road will support the light traffic down to the detention pond.
Grass has grown in through the Terratame2.
Grass has grown in through the Terratame2 after the first growing season.
Roberts Academy Terratame² installation
Installation photo: Terratame² was placed between the school maintenance area and the detention pond.
Roberts Academy TT2 install
Installation photo: Ten rolls of Terratame² model 2020 were unrolled and anchored in less than 2 days.