Project Profile:
St. John The Evangelist Church
Project Summary
A Grasspave2 reinforced firelane was used to reduce the hard surface paving at St. John’s.
Address
9080 Cincinnati / Dayton Rd, West Chester, OH 45069
Install Size
360 m2 (3,875 sq ft)
Designer
N.A.
Contractor
Frame Asphalt Paving Inc, 2100 Springboro Rd, Dayton, OH 45439
Project Gallery

Front entrance to the church. The fire lane is to the left end of this structure.

The no-parking yellow paint on the asphalt indicates the start of the fire lane, but there should be vertical signs to clearly show the path in the grass area.

You can see that there aren’t enough grass plants over the entire lawn area, including the Grasspave2 area. We recommend top dressing and reseeding for more dense growth. Irrigation would help this grass too.