Project Profile:

St. John The Evangelist Church

Project Summary

A Grasspave2 reinforced firelane was used to reduce the hard surface paving at St. John’s.

Address

9080 Cincinnati / Dayton Rd, West Chester, OH  45069

Install Size

360 m2 (3,875 sq ft)

Designer

N.A.

Contractor

Frame Asphalt Paving Inc, 2100 Springboro Rd, Dayton, OH 45439

Project Gallery

Grass paver was installed in the fire lane access areas at St. John The Evangelist Church in West Chester, Ohio, using Grasspave2.
Front entrance to the church. The fire lane is to the left end of this structure.
Permeable paving was installed in the fire lane access areas at St. John The Evangelist Church in West Chester, Ohio, using Grasspave2.
The no-parking yellow paint on the asphalt indicates the start of the fire lane, but there should be vertical signs to clearly show the path in the grass area.
Porous pavement was installed in the fire lane access areas at St. John The Evangelist Church in West Chester, Ohio, using Grasspave2.
You can see that there aren’t enough grass plants over the entire lawn area, including the Grasspave2 area. We recommend top dressing and reseeding for more dense growth. Irrigation would help this grass too.